Installation guide
Installation guide: BT 0 kit 1
For direct ceiling mounting. Item no. 352001 / 362001 (Low Noise).
-
01Position and fasten the rail. -
02Adjust the roller and prepare the carriage. -
03Insert the carriage into the rail. -
04Fit the end stop with PVC buffer. -
05Position the door mounting brackets. -
06Fix the brackets to the door. (4x) -
07Adjust and secure. -
08Check operation.
Good to know
- The rail is not included in the kit and must be ordered separately.
- Kit contents: 2 pcs gate roller, 2 pcs carrier plate and 2 pcs track stop.
- We recommend a maximum of 700 mm between the brackets.
- Do not use oil as a lubricant on the wheels. It dries out the bearings.
Need help?
A/S Tobias Jensen Production, phone +45 43 27 16 85, email ordre@ball-tik.com.